Ice Block Machine
This machine is a block-shaped ice block machine with various sizes tailored to the needs of the market. The ice block machine uses the salt medium as a cooling medium for the process of forming an ice mold into an ice shape beam or the so-called "Brine Tank Technology".
The general technical specifications of the ice block machine are as follows:
Spesifikasi |
Keterangan |
Brand |
VESTREF Refrigeration |
Type |
MEB |
Capacity |
500Kg,1,2,3,5,8,10,15,20,25,30 Ton |
Temperature of raw inlet |
-10°C s/d -15°C |
Temperature of Evaporation |
28 - 30°C |
Temperature of Condentations |
40°C |
Refrigerant |
R22 |
Ice Block Process |
8/12/24 Hours |
Ice Output in 24 hours |
1, 2 or 3 times harvesting process |
Machine operation |
Automatic PLC control Touchscreen |
Ice Block diameter |
5 Kg, 10 Kg, 15 Kg, 20 Kg, 25 Kg, 30 Kg, 50 Kg, 100 Kg |
Electricity |
3 Phase / 380 Vac & 1 Phase / 220 Vac (Inverter) |
Completeness of our Ice Block Machine :
- Brine Tank Tank Unit (customized capacity)
- Unit Molds ice
- Unit Over Head Crane (adjustable capacity)
- Refueling Unit of ice blocks
- Ice Break Beam Unit
- Cooling / Condensing Unit
- Ice Separation Beam Unit from Mold
- Cooling Tower unit(customized capacity)
Excess of our Ice BlockMachine:
- Using semi-hermetic compressor new ecoline to save electricity
- Using the latest technology upgrades (helical separator, automatic set point) so that the machine works optimally
- Machine works for 24 hours full (heavy duty)
- Easy maintenance & affordable spare parts
Notes: - Pricesin Hundreds of Millions (DP Prices Only)- Thegoods are made first (if there are ready, must see the goods in the workshop first). - Prices do not include postage (postagelisted is for sending purchase documents)-Preferably chat to the number listed in the picture of the item - A visit to the workshop is required beforemaking a transaction. (Due to the large value).- Theprice listed is only for the unit of goods (not including installation costs for technicians, accommodation and transportation for installation technicians)